wire, fence, wire mesh, grid, metal, closed, fenced in, security, delimitation, pasture fence, meadow. Fence contractor business service packages: the exclusions that define them
Photo by RosZie on Pixabay

Guides

Fence contractor business service packages: the exclusions that define them

How fence contractors define service packages by what they exclude: the property line, permits, underground conditions, covenants and tier principles for quoting.

What to take away

  • A fencing package is defined by what it excludes. The inclusions are obvious; the exclusions are what stop an argument on day three.
  • Write exclusions as a process rather than as a word. "Excludes rock" starts a dispute. A stated stop-and-requote rule ends one.
  • Four things should almost never sit inside a fixed package price: the property line, the permit, what is under the ground, and what a homeowners association decides.
  • Package tiers work in this trade when they differ by material and by scope of finish, not by vague levels of service.

The exclusion is the product

A customer buying a fence package is buying certainty. You can only sell certainty about the parts you control, and in fencing a surprising share of the job is not under your control at all.

The instinct is to write a long inclusions list. That is the easy half and it persuades nobody, because every competitor's list looks the same. The half that decides whether the job ends well is the boundary of your responsibility, written before anyone digs.

The four things that belong outside a fixed price

The property line. Unless a survey has been done and you have seen it, the line is an assumption. State whose assumption it is. A package that quietly absorbs boundary risk is a package that occasionally funds a fence removal.

Inside vs Outside Fixed Price

Inside the price

Property line
You control
Permit and approval
You apply
Underground
811 marks only
Covenants
You build to spec

Outside the price

Property line
Survey assumption
Permit and approval
Zoning decides
Underground
Rock, footings, roots
Covenants
HOA decides

The permit and the approval. Whether a permit is needed, what height is allowed, how far from the line a fence must sit, and which face must show outward are matters for the local zoning or building department. You can offer to apply. You cannot promise the answer.

What is under the ground. Utility locating through the state 811 service tells you where marked services run. It does not tell you about old footings, buried slabs, irrigation, roots or rock. Those are discovered with the auger.

Association covenants. The homeowners association can be stricter than the municipality and often names materials, colors and heights. The customer holds those documents. Ask for them in writing before quoting a material.

Writing an exclusion that works

A usable exclusion has three parts: the trigger, the action, and who decides.

Anatomy of a Usable Exclusion

  1. Triggercrew cannot reach specified post depth
  2. Causerock, buried structures, unmarked obstructions
  3. Actionwork on affected posts stops
  4. Alternative method and cost presented in writing
  5. No further work until customer approves

If the crew cannot reach the specified post depth with standard augering because of rock, buried structures or unmarked obstructions, work on the affected posts stops. The alternative method and its cost are presented in writing, and no further work on those posts proceeds until the customer approves.

That paragraph does more than a page of caveats. It tells the customer what will happen, when, and that they control the decision. Compare it to a bare line reading "rock excluded", which tells them nothing about what to expect.

Building tiers that mean something

Tiers fail when they are named good, better and best and differ in ways the customer cannot see. They work when each tier changes a decision that is genuinely theirs to make.

Tier Axes: Material and Finish Scope

Material

Appearance
Wood, vinyl, chain link
Maintenance
Wood moves, vinyl brittle
Job end
Tension held
Site
Behavior over time

Finish scope

Appearance
Post cap, top rail
Maintenance
Adjustable gate hardware
Job end
Old fence removed
Site
Spoil hauled away

The honest axes in fencing are material and finish scope. Material changes appearance, maintenance, and behavior over time. Wood moves with moisture, vinyl gets brittle in deep cold, and chain link depends on tension being held.

Finish scope changes how the job ends: whether old fencing is removed and disposed of, spoil from the holes is taken away, the gate gets adjustable hardware, and a post cap and top rail detail is included.

Pick from the fence contractor services and packages guide which families you run.

Use your own contribution figures from the most profitable fence contractor services analysis to see which tiers survive a difficult site rather than only an easy one.

What a package must cost you before it is priced

Before publishing a tier, cost it against the operations that consume the day, not against length. Know your hours for layout, locating, digging, setting, panel work and gates, plus what a return visit after cure costs.

Cost a Tier Before Publishing

  • Hours for layout and locating
  • Hours for digging and setting
  • Hours for panel work and gates
  • Cost of a return visit after cure
  • Records showing income and expenses
  • Claims truthful and substantiated

The capability side sits with equipment and setup for a fence crew. The load-out sits with the equipment checklist for new owners.

Commercial framing belongs in the fence contractor business plan.

The Internal Revenue Service: What kind of records should I keep? guidance says keep a system clearly showing income and expenses, backed by supporting documents. That is the minimum a tiered menu needs to stay honest over a season.

Anything you say publicly about a package has to be supportable. The Federal Trade Commission: Advertising FAQs: A Guide for Small Business guidance requires claims to be truthful and substantiated, with qualifying terms presented clearly rather than in small print. Phrases like all inclusive and lifetime deserve particular care in this trade.

Where a package covers work above grade, the controls in the Occupational Safety and Health Administration: Fall Protection in Residential Construction guidance belong inside the price rather than appearing as a variation later.

Inside the price, outside the price

Where it belongs

Materials, labor, standard hardware
Inside
Waste removal and defined cleanup
Inside
Establishing the property line
Outside
Permit outcome and association approval
Outside
Rock, buried structures, old footings
Outside, with a stated rule
Anything under the old fence
Outside, with a stated rule

Why

Materials, labor, standard hardware
You control the specification and the source
Waste removal and defined cleanup
Measurable and repeatable
Establishing the property line
It is a survey, not a construction task
Permit outcome and association approval
Decided by a body that is not you
Rock, buried structures, old footings
Discovered by the auger, not by the estimate
Anything under the old fence
Nobody can see it at quote stage

Common questions

Should the package price appear on my website?

Publishing a scope helps. Publishing a fixed number attracts the sites where your assumptions are weakest, since the customers with awkward ground shop hardest on a headline figure. A scope with a stated method for the unknowns is more useful to an honest buyer.

How do I handle a customer who wants the exclusions removed?

Price the risk instead of pretending it is gone. If they want rock included, that is a different job with a different method and a different number. Absorbing it silently is not a concession, it is a bet.

What if the association rejects the design after I have quoted?

The quote should already say that association approval is the customer's to obtain and that material substitutions are repriced. Ask for the covenant documents before quoting a material, not after.

Do package customers complain less?

Only if the package told them the truth. A tight scope with clear exclusions reduces disputes. A broad promise that has to be walked back mid job increases them.

More in Guides

Latest from Field Desk