fence, stake, post, fence post, ivy, wooden fence, wooden posts, wood, wooden pole, nature, limitation, landscape, forest, black-and-white. How fence contractor pricing is built from operations
Photo by Didgeman on Pixabay

Guides

How fence contractor pricing is built from operations

Fence contractor pricing is built from six job quantities and a labor-hour formula, not a rate per foot. Unknowns are priced by a stop-and-requote clause.

What to take away

  • Fence contractor pricing is built from operations and unknowns, not from a rate per foot. The rate per foot is an output, not an input.
  • Six quantities decide the numberhole count, ground difficulty, run geometry, gate count, access, and boundary certainty. Length is only one input into the first of them.
  • The unknowns should be priced as a stated method rather than as padding. A stop-and-requote clause is worth more than a contingency percentage.
  • Fill those quantities from your own recorded hours. A published rate describes someone else's ground and crew.

Why the rate per foot lies

Two runs of identical length can differ by a full crew day. One is flat, in workable soil, with a straight line, one gate and clear access. The other steps down a slope, hits fill and rubble, needs a wider gate on a heavy post, and can only be reached by carrying material through a house.

Same Length, Different Job

Easy run

Ground
Workable soil
Line
Straight and flat
Gate
One standard gate
Access
Clear from truck
Crew time
One day

Hard run

Ground
Fill and rubble
Line
Steps down a slope
Gate
Wider gate, heavy post
Access
Carried through a house
Crew time
A full extra day

A rate per foot averages those two. That means it overprices the easy job and underprices the hard one, which is exactly backward: the customer with the easy site shops around and leaves, and the customer with the difficult site accepts immediately. Over a season this selects your work for you, and not in your favor.

Build the price from the operations, then divide by length at the end if you want a figure to sanity check against.

The six quantities that set the price

Hole count. Set by run length, post spacing, corners, ends and gate posts. Corners and gates add posts that are not evenly spaced, which is why counting from a plan underestimates.

Six Quantities That Set Price

  • Hole countlength, spacing, corners, ends, gate posts
  • Ground difficultysoil, root mat, fill, rock
  • Run geometrystraight, stepped, racked, curved
  • Gate count and sizeposts, hardware, geometry
  • Accesscarry distance, machine entry, ground
  • Boundary certaintysurvey, pins, old fence, memory

Ground difficulty. What the auger meets. Workable soil, root mat, fill and rubble, or rock are four different jobs. This is the quantity with the widest range and the one you can least see from the road.

Run geometry. Whether the line is straight and level or stepped, racked, curved or broken by obstructions. Slope changes panel count on the same length, and a stepped run creates gaps at grade that have to be managed.

Gate count and size. A gate is a post sizing decision, a hardware decision and a geometry decision. It is close to independent of run length and it is where callbacks come from.

Access. How far material and spoil have to travel from the truck, whether a machine can get in, and what the ground will take. Carrying is a labor multiplier that appears nowhere in a material list.

Boundary certainty. Whether the line is established by a survey, by pins, by an existing fence, or by the customer's recollection. This does not change the labor. It changes the risk, and risk belongs in the terms rather than in the number.

From quantities to a price, in symbols

Let H be hole count and h crew hours per hole in expected ground. Let p be panel hours per unit length over length L.

From Quantities to a Price

  1. Labor hours: H x h plus L x p plus G x g plus M x V
  2. Multiply by burdened crew cost per hour
  3. Add materials, disposal, machine hire = job cost
  4. Add overhead per crew day consumed
  5. Add intended margin
  6. Divide by length for implied rate per foot

Let g be gate hours per gate over gate count G. Let M be mobilization allowance per visit for load, travel, setup, and pack down, times number of visits V.

Labor hours are (H times h) plus (L times p) plus (G times g) plus (M times V). Multiply by the fully burdened crew cost per hour to get direct labor. Add direct materials, disposal and any machine hire. That is job cost.

Then recover overhead, not as a percentage of materials; materials vary wildly between a chain link run and a specified vinyl one.

Recover overhead per crew day, since crew days are what your fixed costs buy. Divide annual overhead by the crew days you realistically expect to sell. Add that rate for each day the job consumes, including the return visit after cure.

Finally add the margin you intend to earn, and only then divide by length to see the implied rate per foot. If that implied rate looks unfamiliar, the interesting question is which of the quantities above is unusual on this job.

Pricing the unknowns without padding

Padding every quote to cover the worst site means the easy jobs subsidize the hard ones and you lose the easy jobs. The alternative is to price what you know and to name a method for what you do not.

Pricing the Unknowns

Can specified depth be reached by standard augering?

Yes

dig as quoted, no change

No

stop work on those posts

Write the trigger, the action and the decision maker. If the specified depth cannot be reached by standard augering because of rock, buried structures or unmarked obstructions, work on those posts stops, the alternative method is quoted in writing, and nothing proceeds until the customer approves. The customer is not surprised, and you are not gambling.

Do the same with the boundary. State what the line was taken from and who supplied it. If it came from the customer's recollection, say so in the quote.

Pricing approaches compared

Where it works

Rate per linear foot
Repeat work on similar sites
Rate plus itemized extras
Transparent to the customer
Operation based build-up
Any site, once you have hours
Match the competitor
Never, as a system
Cost plus fixed margin
Cost reimbursable work

Where it fails

Rate per linear foot
Slope, rock, access, gates
Rate plus itemized extras
Long quotes, many arguments
Operation based build-up
Needs recorded hours to work
Match the competitor
Immediately, on any unusual site
Cost plus fixed margin
Fixed price residential jobs

What it hides

Rate per linear foot
The cost of the difficult job
Rate plus itemized extras
Nothing, if the extras are real
Operation based build-up
Nothing, but it takes discipline
Match the competitor
Your own cost structure
Cost plus fixed margin
The incentive to be efficient

What has to be true for any of this to work

You need your own hours per operation. Not job totals: hours split into layout, locating, digging, setting, panel work and gate. Without that split you cannot tell whether a job went wrong in the ground or at the gate, and every correction is a guess.

The Internal Revenue Service: What kind of records should I keep? guidance describes keeping a system that clearly shows income and expenses with supporting documents behind purchases, sales and payroll. That is the accounting floor. The operational split above is what makes the pricing work, and it has to be collected on the job.

For labor cost inputs, the U.S. Bureau of Labor Statistics: Occupational Employment and Wage Statistics Tables publish employment and wage estimates by occupation, industry, state and metropolitan area. Check whether your assumed pay is plausible where you work.

They will not tell you what your crew produces in a day, which is the other half of a labor cost.

For the wider commercial structure around pricing, the U.S. Small Business Administration: SBA Business Guide covers the management stage a pricing system sits inside.

Saying it in public

Anything you advertise about price must be supportable.

The Federal Trade Commission: Advertising FAQs: A Guide for Small Business guidance requires truthful, substantiated claims. Qualifying information must be clear, not buried.

In fencing, risky phrases include a starting price almost no real job meets, any claim about how quickly a job completes, and any suggestion that a figure includes items your own quote excludes.

What you may offer is set by the compliance side of fence work.

Common questions

Should I give a price over the phone?

Give a method, not a price. You can explain what drives the number and what you need to see. A phone figure becomes the number the customer remembers, and every later correction reads as a change of story.

How do I handle a customer comparing me to a much lower quote?

Ask what the other quote includes: depth, disposal, gate hardware, and what happens if rock appears. Most gaps between fencing quotes are scope gaps rather than margin gaps, and the comparison is easier to have when your own exclusions are written down.

What margin should a fencing business target?

It is set by what your own work earns per crew day. Take the labor hours and the overhead rate above, compute what your current jobs actually return per crew day, and decide whether that funds the business you want. A percentage copied from a guide is a percentage for a different business.

When should prices be reviewed?

When an input moves: material cost, wages, fuel, insurance, or your own productivity. Reviewing on a calendar while inputs move underneath is how a price list drifts out of contact with the work.

More in Guides

Latest from Buyers Desk